Oct
27
We were asked to provide the steelwork for this industrial building in Stroud. Existing buildings were in close proximity on both sides this made it important that all steel was loaded in such a way that it could be unloaded with the minimum of re-slinging on site.
Due to the specification required it meant that every single piece of steel…both the main structure and also the cold rolled had to be moved and installed by crane. Again good organisation of steel on site meant that there was minimal unneccesary movement of materials.
The main steel frame was completed and the crane off hired within 3 days. After lining up of steelwork and tidying of site the building was handed over ready for cladding.