<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Mace Buildings Ltd</title>
	<atom:link href="http://macebuildings.co.uk/blog/?feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://macebuildings.co.uk/blog</link>
	<description></description>
	<lastBuildDate>Tue, 27 Oct 2009 11:38:14 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.5</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Carpet Factory, Stroud</title>
		<link>http://macebuildings.co.uk/blog/?p=56</link>
		<comments>http://macebuildings.co.uk/blog/?p=56#comments</comments>
		<pubDate>Tue, 27 Oct 2009 10:39:20 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[General]]></category>
		<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Industrial Building]]></category>
		<category><![CDATA[Steel]]></category>
		<category><![CDATA[Steel Building]]></category>
		<category><![CDATA[Steel buildings]]></category>
		<category><![CDATA[Steel erecting]]></category>
		<category><![CDATA[Steel frame building]]></category>
		<category><![CDATA[Structural steel]]></category>

		<guid isPermaLink="false">http://macebuildings.co.uk/blog/?p=56</guid>
		<description><![CDATA[Industrial steel building for a carpet factory in stroud, both hot rolled steel and cold rolled steel, fabricated and erected by mace buildings ltd.]]></description>
			<content:encoded><![CDATA[<p>We were asked to provide the steelwork for this industrial building in Stroud. Existing buildings were in close proximity on both sides this made it important that all steel was loaded in such a way that it could be unloaded with the minimum of re-slinging on site. </p>
<p><a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/File0364.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/th_File0364.jpg" border="0" alt="" ></a>  <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/File0367.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/th_File0367.jpg" border="0" alt="" ></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/File0378.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/th_File0378.jpg" border="0" alt="" ></a></p>
<p>Due to the specification required it meant that every single piece of steel&#8230;both the main structure and also the cold rolled had to be moved and installed by crane. Again good organisation of steel on site meant that there was minimal unneccesary movement of materials.  </p>
<p><a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/File0371.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/th_File0371.jpg" border="0" alt="" ></a>   <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/File0376.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/th_File0376.jpg" border="0" alt="" ></a>  <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/File0373.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Carpet%20Factory/th_File0373.jpg" border="0" alt="" ></a></p>
<p>The main steel frame was completed and the crane off hired within 3 days. After lining up of steelwork and tidying of site the building was handed over ready for cladding.</p>
]]></content:encoded>
			<wfw:commentRss>http://macebuildings.co.uk/blog/?feed=rss2&amp;p=56</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Madeley Acadamy, Telford</title>
		<link>http://macebuildings.co.uk/blog/?p=48</link>
		<comments>http://macebuildings.co.uk/blog/?p=48#comments</comments>
		<pubDate>Tue, 27 Oct 2009 09:47:18 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[General]]></category>
		<category><![CDATA[Building]]></category>
		<category><![CDATA[Fabrication]]></category>
		<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Industrial Building]]></category>
		<category><![CDATA[Industrial Buildings]]></category>
		<category><![CDATA[Steel]]></category>
		<category><![CDATA[Steel Building]]></category>
		<category><![CDATA[Steel buildings]]></category>
		<category><![CDATA[Steel erecting]]></category>
		<category><![CDATA[Steel frame building]]></category>
		<category><![CDATA[Structural steel]]></category>
		<category><![CDATA[Welding]]></category>
		<category><![CDATA[Welding and fabrication]]></category>
		<category><![CDATA[Workshop]]></category>

		<guid isPermaLink="false">http://macebuildings.co.uk/blog/?p=48</guid>
		<description><![CDATA[Madeley Acadamy is in Telford. Main contracters Bowmer and Kirkland contracted us to design, fabricate and erect the steel frame that was required for the installation of air condition units. The structural steel was delivered to site at 8am on Monday.  After site induction erection commenced and the main frame was in place before the days [...]]]></description>
			<content:encoded><![CDATA[<p>Madeley Acadamy is in Telford. Main contracters Bowmer and Kirkland contracted us to design, fabricate and erect the steel frame that was required for the installation of air condition units. The structural steel was delivered to site at 8am on Monday.  After site induction erection commenced and the main frame was in place before the days end. Tuesday morning saw the steelwork finished and handed over to the client.</p>
<p><a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/310320091970.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/th_310320091970.jpg" border="0" alt="" ></a>  <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/310320091974.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/th_310320091974.jpg" border="0" alt="" ></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/310320091980.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/th_310320091980.jpg" border="0" alt="" ></a> </p>
<p><a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/310320091984.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/th_310320091984.jpg" border="0" alt="" ></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/310320091991.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/th_310320091991.jpg" border="0" alt="" ></a>  <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/310320091990.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Bowmer%20and%20Kirkland/Air%20Con%20Support/th_310320091990.jpg" border="0" alt="" ></a></p>
]]></content:encoded>
			<wfw:commentRss>http://macebuildings.co.uk/blog/?feed=rss2&amp;p=48</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Beeches Farm Industrial Building</title>
		<link>http://macebuildings.co.uk/blog/?p=23</link>
		<comments>http://macebuildings.co.uk/blog/?p=23#comments</comments>
		<pubDate>Fri, 23 Oct 2009 10:58:51 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[General]]></category>
		<category><![CDATA[Building]]></category>
		<category><![CDATA[Fabrication]]></category>
		<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Industrial Building]]></category>
		<category><![CDATA[Industrial Buildings]]></category>
		<category><![CDATA[Steel]]></category>
		<category><![CDATA[Steel Building]]></category>
		<category><![CDATA[Steel buildings]]></category>
		<category><![CDATA[Steel erecting]]></category>
		<category><![CDATA[Steel frame building]]></category>
		<category><![CDATA[Structural steel]]></category>
		<category><![CDATA[Welding]]></category>
		<category><![CDATA[Workshop]]></category>

		<guid isPermaLink="false">http://macebuildings.co.uk/blog/?p=23</guid>
		<description><![CDATA[Beeches Farm Industrial Estate is located near Kettering. We have provided various services to the site over the years from refurbishments to new builds. On this occasion a new building was required to accommodate a workshop and offices.
  
The old existing buildings were removed as they were unsuitable for the client. As soon as [...]]]></description>
			<content:encoded><![CDATA[<p>Beeches Farm Industrial Estate is located near Kettering. We have provided various services to the site over the years from refurbishments to new builds. On this occasion a new building was required to accommodate a workshop and offices.</p>
<p><a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0443.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0443.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0446.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0446.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0449.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0449.jpg" border="0" alt="" /></a></p>
<p>The old existing buildings were removed as they were unsuitable for the client. As soon as the site was cleared and ready we first of all visited and marked out the locations of the holding down bolts so as they could be installed prior to erection.</p>
<p><a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0451.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0451.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0454.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0454.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0464.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0464.jpg" border="0" alt="" /></a></p>
<p>Once the steel frame arrived erection was started immediatly and the main frame was up within the day. Secondary steelwork was then fitted. This is primarily cold rolled sections that are needed for cladding purposes. Also any door steelwork and window trimmers.</p>
<p><a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0483.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0483.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0489.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0489.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0493.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0493.jpg" border="0" alt="" /></a></p>
<p>This was then followed by the erection of handrails and netting ready for cladding. The cladding itself was composite panels on the roof and also on the sides.</p>
<p><a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0572.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0572.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0591.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0591.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/IMG_0594.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Beeches%20Farm/New%20Workshop/th_IMG_0594.jpg" border="0" alt="" /></a></p>
<p>Linking onto existing buildings meant that extra care was needed so as not to disrupt other companies operating on the site.<br />
The client was looking to move into the new building as soon as possible so it was important that everything went to plan and was within the timescale allowed for the project. This was achieved with no problems or disruptions.</p>
]]></content:encoded>
			<wfw:commentRss>http://macebuildings.co.uk/blog/?feed=rss2&amp;p=23</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Audi Garage Extension in Amersham</title>
		<link>http://macebuildings.co.uk/blog/?p=6</link>
		<comments>http://macebuildings.co.uk/blog/?p=6#comments</comments>
		<pubDate>Fri, 23 Oct 2009 07:21:53 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[General]]></category>
		<category><![CDATA[Building]]></category>
		<category><![CDATA[Fabrication]]></category>
		<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Industrial Building]]></category>
		<category><![CDATA[Industrial Buildings]]></category>
		<category><![CDATA[Showroom]]></category>
		<category><![CDATA[Steel]]></category>
		<category><![CDATA[Steel Building]]></category>
		<category><![CDATA[Steel buildings]]></category>
		<category><![CDATA[Steel erecting]]></category>
		<category><![CDATA[Steel erection]]></category>
		<category><![CDATA[Steel frame building]]></category>
		<category><![CDATA[Structural steel]]></category>
		<category><![CDATA[Welding]]></category>
		<category><![CDATA[Welding and fabrication]]></category>
		<category><![CDATA[Workshop]]></category>

		<guid isPermaLink="false">http://macebuildings.co.uk/blog/?p=6</guid>
		<description><![CDATA[Amersham Audi were looking to extend their car showroom and we were happy to provide a solution.
Using Strucad to produce the fabrication drawings the steel frame was soon being fabricated in our workshops. We visited site prior to erection to mark out and install grillage beams that were required to span over existing below ground [...]]]></description>
			<content:encoded><![CDATA[<p>Amersham Audi were looking to extend their car showroom and we were happy to provide a solution.<br />
Using Strucad to produce the fabrication drawings the steel frame was soon being fabricated in our workshops. We visited site prior to erection to mark out and install grillage beams that were required to span over existing below ground services. This ensured that upon arrival of our erection team we could progress quickly with the steelwork.</p>
<p><a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/25022008061.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/th_25022008061.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/25022008065.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/th_25022008065.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/25022008062.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/th_25022008062.jpg" border="0" alt="" /></a><br />
All steel was erected and lined and levelled ready for other contractors begin work on the project within the week.<br />
Being in such close proximity to a major highway and also joining onto an active business premises meant that minimal disruption to both was of the utmost importance.</p>
<p><a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/25022008072.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/th_25022008072.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/25022008077.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/th_25022008077.jpg" border="0" alt="" /></a> <a href="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/29022008101.jpg" target="_blank"><img src="http://i23.photobucket.com/albums/b397/Oerlikon/Mace%20Buildings/Amersham%20Audi/th_29022008101.jpg" border="0" alt="" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://macebuildings.co.uk/blog/?feed=rss2&amp;p=6</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

